I really should take my camera to work. by tomorrow it might be too late. I'll try to remember to stick it in my bag though.
The church is putting an elevator lift put in - which will be a huge asset to all the ministries that go on in the building. However, they decided the best place to put it would be in the corner of my office~ Yikes!
Demolition has begun. They started in the lower level by jackhammering out the floor and pouring new concrete down a little lower. And then they took out the wall (cement blocks). What a huge mess! It was sooooo dusty everywhere. and I mean EVERYWHERE!!
Last Friday they moved the cabinets that were back in that corner and then rigged up a place for me to move the copier too. It is quite crowded and junky looking! It might make me crazy before too long!
Last night the began the work in my office. Chuck left a big roll of plastic for me to cover everything, so cover I did! And anticipated a huge mess this morning. However, I was pleasantly surprised to find a very minimal mess. However, I thought they were just cutting a doorway in the one wall. This morning upon arrival, the whole corner of the office was missing! They took out both "outside" walls so they can build up with the concrete blocks. and they removed the layer of concrete under the carpet. All that was left was the 'tin' stuff.
I covered everything up again tonight and before I left, Chuck was making horribly loud noises and working on prep for cutting through the floor/ceiling. He said by the time I get there tomorrow, there will be a cememt block wall 13 tiers high.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment